Fee schedule effective December 1, 2020.

When you submit an application, staff will calculate the fees and email you an itemized invoice. You can pay this invoice online and a receipt will be emailed to you.

Contact us at row.permits@multco.us or 503.988.3582 if you have any questions about making payments.  

Driveways and Sidewalks

§ 27.052 (A)(3)(a) construction or reconstruction of driveway approaches $300
 • Each additional inspection or field visit (2 inspections included in application fee) $150
§ 27.052 (A)(3)(d) sidewalk and/or curb construction or reconstruction $200

Right of Way Permits

§ 27.052 (A)(3)(a) manholes for storm and sanitary sewers minimum fee (application processing + inspection for one manhole) $200
 • Each additional manhole after the first manhole $30
§ 27.052 (A)(3)(b) canopies, awnings and marquees $200
§ 27.052 (A)(3)(a) sewer connections (per connection) $250
§ 27.052 (A)(3)(b) drilling or boring test hole minimum fee (application processing + inspection for one hole) $200
 • Each additional hole after the first hole $30
§ 27.052 (A)(3)(c) curb drain outlet construction or reconstruction including drainage connections to catch basins $300
§ 27.052 (A)(3)(e) release advertising bench picked up within the right-of-way $200
§ 27.052 (A)(3)(f) any excavation, construction, reconstruction, repair, removal, abandonment, placement or use within the right-of-way $250
§ 27.052 (A)(3)(g) material filling or excavating within the public right-of-way $250

Special Event Permit

§ 29.712 (A) Special Event Permit Application Fee $200
§ 29.712 (B)(1) Special Event Deposit amount: >10hrs administrative staff time required $855

Street or Lane Closure

§ 27.052 (A)(3)(l) temporary closure of any street or any portion of a street $300
MCRR 13.600 Extended Temporary Closure (deposit) 120%

Planning and Development Review

§ 29.506: Transportation Compatibility Assessment $78
§ 29.506: Transportation Planning Review $500
MCRR 16.000: Road Rules Variance (requires notice fee in addition) $1200
MCRR 26.150 Stormwater review $200
MCRR 7.000 Transportation Impact Study review $200

Construction Permit

§ 27.055 Street and Road Widening Permits (Construction Permit):
Minimum deposit for Administrative review
$3000
 • Deposit for Construction Phase - % of project construction cost for the portion of the project within and adjacent to County right of way 10%

Road Vacation

§ 27.054 Road Vacation Application: Feasibility Study $500
 • Application deposit (% of estimated costs) 120%
 • Minimum deposit plus $65 for posting $1000

Overdimensional Permits

§ 27.052(A)(1) Overweight or overdimensional move (consistent with ODOT) $8
§ 27.052(A)(2) Building and Structure move: deposit amount set by code $1000
 • Permit application and inspection fees: structure under 14ft width and 15 ft height $200
 • Permit application: structure over 14ft width and 15 ft height (inspection billed at actual cost) $250
 • Permit application: overdimensional greater than 17 ft in height other than house moves (normal work day) (inspection billed at actual cost) $250
 • Permit application: overdimensional greater than 17 ft in height other than house moves (holiday or weekend) (inspection billed at actual cost) $300

Storm and Sanitary Sewer

§ 27.052 (A)(3)(k) underground storm or sanitary sewer construction, reconstruction or repair, including property service and laterals not maintained by the county:
 • 0-100 ft length $600
 • 101-200 ft $650
 • 201-300 ft $700
 • 301-400 ft $750
 • 401-500 ft $800
 • >500 ft base amount $800
 • >500 ft additional $/100ft $50

General and Miscellaneous

§ 27.056 Miscellaneous Public Works Fees: Minimum fee $250
 • Deposit for County design, plan review and inspection 120%
§ 27.052 (C) permit authorizing work under ORS 374.305 not covered in this section (minimum fee, deposit set by code at 120% est. full cost recovery) $250
§ 27.053 plan review and inspection of underground installations and street intersections -
 • (A) When completed facilities are to be maintained by the county: minimum deposit at time of application $3000
    - Deposit for Construction Phase - % of project construction cost for the portion of the project that will be maintained by the County 10%
 • (C) Storm and sanitary sewer lines to be maintained by others located within a county right of way:
    - 0-100 Ft length $600
    - 101-200 ft $650
    - 201-300 ft $700
    - 301-400 ft $750
    - 401-500 ft $800
    - >500 ft base amount $800
    - >500 ft additional $/100ft $50
 • (D) Storm or sanitary sewer connecting to county-maintained systems : minimum deposit $3000
    - Deposit for Construction Phase - % of project construction cost for the portion of the project that will connect to systems maintained by the County 10%
 • (G) For plan review and inspection of each street intersection or vehicle access, either public or private, other than a standard driveway approach $300
MCRR 18.135 Permit extension $50


References: